The Water Resource Recovery Facility (WRRF)
Project Design & Permitting
Conceptual Wastewater Treatment Alternatives Technical MemorandumProject CharterProject EIR (Draft)Project EIR (Final / Response to Comments Volume)Technical Appendix for the EIREnvironmental ReportProject Soils ReportWastewater Rate StudyTown Hall & Other Meeting Presentations
Preliminary Draft Site AnalysisPhase 1 Overview & Funding & Financing Evaluation & Flows & Loading UpdateBeneficial Use AnalysisProject IntroductionComparative Analysis Environmental Impact Report - Scoping MeetingTreatment Process & Technology SelectionOutfall
Map of Outfall AreaOutfall Construction VideoMitigation Monitoring Reporting PlanInitial Environmental Study: Technical AttachmentsSolar Photovaltaic System
Solar Site: Rough Grading & Drainage PlanSolar Site Drone PhotosDedication Ceremony / Grand Opening
Click here to see photos from our Dedication Ceremony / Grand Opening
Cayucos Claims Independence!
On September 14th, 2021 at 12:00p.m., Cayucos Sanitary District ceased pumping wastewater to the City of Morro Bay.
![May contain: clothing, apparel, person, human, hardhat, helmet, soil, and pants](https://streamline.imgix.net/26a8d4f5-6101-4ccf-8a13-ea2cc81a1a75/8f65b7c9-c714-45ab-9256-1a0913dc4f02/Shut%20Off.jpg?ixlib=rb-1.1.0&w=2000&h=2000&fit=max&or=0&s=58ae75261c74b14d83cbce3b1c54a2ec)